Build local assembly and manufacturing capabilities with flexible SKD and CKD supply models, supported by clear material definition, assembly processes, testing and production documentation.
Discuss Your Project →Key modules are prepared and tested by Sino Networks, while final assembly and selected production steps move to your local operation.
The product is supplied at a deeper component or sub-assembly level, allowing more manufacturing processes to be completed locally.
The exact SKD / CKD scope is defined project by project according to assembly capability, local sourcing, quality requirements and production strategy.
Confirm the target SKD / CKD level and local production capability.
Define which assembly and manufacturing steps stay with Sino and which move locally.
Organize materials, sub-assemblies, packing and documentation for local assembly.
Align assembly methods, testing, quality criteria and pilot production.
Move into repeatable local assembly, testing, packing and delivery.



BOM, material coding, labels, batch control, ESD protection and packing are defined before shipment.
Assembly, programming, testing, QC and packing stations are organized around the local production process.
A validation kit verifies test equipment, assembly methods, tooling and acceptance criteria before production release.
Whether you are evaluating SKD, CKD or a phased localization plan, we can help define the supply model, production process and validation path around your local capabilities.
Discuss Your Project →Tell us where the product will be assembled and supplied.
Share your available assembly, SMT, testing and quality capabilities.
Define the intended local content, process scope or Made-in-local objective.
Provide the target switch model, specification or existing project requirement.